trusted seller

Sanitary Systems

The application of our range of Sanitary Systems can be noticed in wastewater management arena. Designed for experimenting purpose, these precisely developed systems are equipped with see through drainage pipe for complete viewing of their working process, remote control operated solenoid valve for their easy opening or closing procedure, rotameter for flow rate measurement purpose and closed water circuit to name a few. These Sanitary Systems are also used to eradicate contaminated particles like residues of sealing or soldering materials from the inside of drinking water pipelines.

Product Image (MTS-18004)

Pipe Cleaning Training Panel

Price: 10 INR/Piece

Pipe Cleaning Training Panel: Micro Teknik is manufacture, exporters & suppliers Technical Description The flushing process is intended to remove contaminants, for example the remnants of solder or sealant from the drinking water pipes. The individual pipe circuits must be flushed from bottom to top. It is possible to observe the flushing action by means of transparent pipe sections. Flushing is performed via two lines that are connected to a cold water supply. Contaminants are introduced into the pipe system through openings with shut-off valves. Original plumbing components are used in the unit. A supply of water is required for operation. The training panel can be fitted to the Universal Stand for Training Panels.

Product Image (MTS-18001)

Base Unit for Sanitary Modules

Price: 10 INR/Piece

Base Unit for Sanitary Modules: Micro Teknik Technical Description The trolley-mounted base unit forms the core for a variety of installation exercises aimed squarely at heating and plumbing trainees. The unit has a perforated backboard on which module panels with a wide range of sanitary elements can be rapidly and easily fitted. Using metal hoses with quick-release couplings, the individual modules can be combined into functional systems. Several base units can be used together if required for large and complex set-ups. Any water that leaks out when modifications are made is collected in a tray at the base of the trolley.

Product Image (MTS-18002)

Full Scale Sewerage System

Price: 10 INR/Piece

Full Scale Sewerage System: Micro Teknik is manufacture, exporters & suppliers Technical Description This full-scale unit contains a comprehensive sewerage pipe system with many branches fabricated using high quality glass laboratory pipes. Using this unit the flow and pressure can be investigated at various junctions, pipe offsets, changes in cross-section and at siphons under varying ventilation situations. Elevated tanks can be emptied using a remote control so that a realistic flow of waste water can be produced. The unit has a closed water circuit with pump and tank. A supply of three-phase mains electricity and compressed air is required for operation.

Product Image (MTS-18006)

Sanitation Fittings Training Panel

Price: 10 INR/Piece

Sanitation Fittings Training Panel: Micro Teknik is manufacture, export & suppliers Technical Description Common sanitation fittings, which are not included, can be connected and investigated in respect of their function and operation on this training panel. The panel provides several methods of connection so products from different manufacturers can be used. Some connectors are flexible and will adapt to different sized fittings. Supplies of hot and cold water are required for operation. The training panel can be fitted on the Universal Stand.

Product Image (MTS-18003)

Protection of Drinking Water Training Panel

Price: 10 INR/Piece

Protection of Drinking Water Training Panel: Micro Teknik is manufacture, exporters & suppliers Technical Description An open pipe system that simulates a domestic installation for drinking water with four different levels is mounted on the training panel. The levels represent the cellar (drinking water connection level) and three floors. It is possible to simulate a pipe fracture or a pressure drop. During this process the return of contaminated water into the drinking water pipe can be observed. A water supply is necessary for operation. The training panel can be fitted to the Universal Stand.

X


Back to top